Home » , » A ship arrives in port trimmed 25 cms. by the stern. The centre of flotation is amidships. MCT I cm. 100 tonnes-m.

A ship arrives in port trimmed 25 cms. by the stern. The centre of flotation is amidships. MCT I cm. 100 tonnes-m.




A ship arrives in port trimmed 25 cms. by the stern. The centre of flotation is amidships. MCT I cm. 100 tonnes-m. A total of 3,800 tonnes of cargo is to be dischargedfr om 4 holds, and 360 tonnes of bunkers loaded in No. 4 double bottom tank. 1,200t onneso f the cargoi s to be dischargedfr om No. 2 hold and
600 tonnesf rom No. 3 hold. Find the amount to be dischargedfr om Nos. I and 4 holds if the ship is to complete on an even keel.





Write to me at marinenotes4u@gmail.com,283928@gmail.com.::MK::.

Facebook:Marine NotesTwitter:ACMWCTRss:ACMWCT
Marine Notes - MMD Exams India and Baiscs
URL: HTML link code: BB (forum) link code:
© Marine Notes - MMD Exams India and Basics (M&K Groups Ltd)

1 comments:

Bernard Zherge said...

I like this post i love to read all the details here,Thanks for sharing this,

Best regards,
Bernard Zherge
nulled Graphics

Facebook Marine Notes
Twitter Marine Notes
Rss Marine Notes

Followers

Follow by Email

Archive